Commit Graph

6 Commits

Author SHA1 Message Date
James Shubin
43839d1090 all: Switch the --lang syntax to use argv instead
It was a bit awkward using `mgmt run lang --lang <input>` so instead, we
now drop the --lang, and read the positional argv for the input.

This also does the same for the --yaml frontend.
2019-05-05 11:10:47 -04:00
James Shubin
0d0d48d9f6 test: Shell tests should use unified timeout command 2019-02-24 12:28:59 -05:00
James Shubin
ccad6e7e1a test: Enable and fix up some more tests
An unstable engine probably masked some of these issues.
2019-02-24 12:28:59 -05:00
James Shubin
96dccca475 lang: Add module imports and more
This enables imports in mcl code, and is one of last remaining blockers
to using mgmt. Now we can start writing standalone modules, and adding
standard library functions as needed. There's still lots to do, but this
was a big missing piece. It was much harder to get right than I had
expected, but I think it's solid!

This unfortunately large commit is the result of some wild hacking I've
been doing for the past little while. It's the result of a rebase that
broke many "wip" commits that tracked my private progress, into
something that's not gratuitously messy for our git logs. Since this was
a learning and discovery process for me, I've "erased" the confusing git
history that wouldn't have helped. I'm happy to discuss the dead-ends,
and a small portion of that code was even left in for possible future
use.

This patch includes:

* A change to the cli interface:
You now specify the front-end explicitly, instead of leaving it up to
the front-end to decide when to "activate". For example, instead of:

mgmt run --lang code.mcl

we now do:

mgmt run lang --lang code.mcl

We might rename the --lang flag in the future to avoid the awkward word
repetition. Suggestions welcome, but I'm considering "input". One
side-effect of this change, is that flags which are "engine" specific
now must be specified with "run" before the front-end name. Eg:

mgmt run --tmp-prefix lang --lang code.mcl

instead of putting --tmp-prefix at the end. We also changed the GAPI
slightly, but I've patched all code that used it. This also makes things
consistent with the "deploy" command.

* The deploys are more robust and let you deploy after a run
This has been vastly improved and let's mgmt really run as a smart
engine that can handle different workloads. If you don't want to deploy
when you've started with `run` or if one comes in, you can use the
--no-watch-deploy option to block new deploys.

* The import statement exists and works!
We now have a working `import` statement. Read the docs, and try it out.
I think it's quite elegant how it fits in with `SetScope`. Have a look.
As a result, we now have some built-in functions available in modules.
This also adds the metadata.yaml entry-point for all modules. Have a
look at the examples or the tests. The bulk of the patch is to support
this.

* Improved lang input parsing code:
I re-wrote the parsing that determined what ran when we passed different
things to --lang. Deciding between running an mcl file or raw code is
now handled in a more intelligent, and re-usable way. See the inputs.go
file if you want to have a look. One casualty is that you can't stream
code from stdin *directly* to the front-end, it's encapsulated into a
deploy first. You can still use stdin though! I doubt anyone will notice
this change.

* The scope was extended to include functions and classes:
Go forth and import lovely code. All these exist in scopes now, and can
be re-used!

* Function calls actually use the scope now. Glad I got this sorted out.

* There is import cycle detection for modules!
Yes, this is another dag. I think that's #4. I guess they're useful.

* A ton of tests and new test infra was added!
This should make it much easier to add new tests that run mcl code. Have
a look at TestAstFunc1 to see how to add more of these.

As usual, I'll try to keep these commits smaller in the future!
2018-12-21 06:22:12 -05:00
Johan Bloemberg
572b2575c5 test: Export the mgmt command to be used during test 2018-02-18 14:19:05 -05:00
James Shubin
d8e19cd79a semaphore: Create a semaphore metaparam
This adds a P/V style semaphore mechanism to the resource graph. This
enables the user to specify a number of "id:count" tags associated with
each resource which will reduce the parallelism of the CheckApply
operation to that maximum count.

This is particularly interesting because (assuming I'm not mistaken) the
implementation is dead-lock free assuming that no individual resource
permanently ever blocks during execution! I don't have a formal proof of
this, but I was able to convince myself on paper that it was the case.

An actual proof that N P/V counting semaphores in a DAG won't ever
dead-lock would be particularly welcome! Hint: the trick is to acquire
them in alphabetical order while respecting the DAG flow. Disclaimer,
this assumes that the lock count is always > 0 of course.
2017-02-27 02:57:06 -05:00